Knowledge Center

How to Order Gutters and Downpipe Accessories

A gutter order needs outlets, ends, supports and changes of direction as well as straight lengths.

Discuss your project
GMiSU Technical Team
In this guide
Gutter from the GMiSU product catalogue
Gutter
Downpipe Elbow from the GMiSU product catalogue
Downpipe Elbow

Map the drainage route

Mark roof drainage areas, gutter runs, downpipe locations and the final discharge points. Include building corners and any obstacles that require an offset. Hydraulic sizing must suit the project rainfall and roof area.

Avoid missing connections

Check left and right end caps, internal and external corners, connectors, supports, outlets and downpipe elbows. A total gutter length alone does not establish the fittings needed to assemble the system.

Confirm compatibility

Match gutter and pipe shapes, connection sizes, finishes and fixing substrates. Support spacing and outlet capacities belong to the selected system's installation details, rather than a universal spacing rule.

Drainage bill of materials

Drainage bill of materials
PartQuantity planning
Gutter troughsSchedule each run and the agreed individual lengths
Brackets / hangersAccording to the selected support detail
Left and right end capsMatch each open end of an independent run
Internal / external cornersCount each change of direction on the plan
OutletsMatch the hydraulically sized discharge locations
DownpipesSchedule height, cross-section and individual lengths
Offset elbowsIdentify the offset from gutter to wall
Pipe clipsMatch the wall substrate and support layout
Leaf strainersOptional protection at suitable outlets, with maintenance access

Coordinate assembly before delivery

Confirm the fall toward the outlet, support arrangement, joints, sealant and downpipe connections. Available configurations include a 1.0 mm aluminum gutter option in 2 m or 3 m sections; specify the actual supplied section in the order. Run length alone is not enough to size an outlet or determine bracket spacing.

Discuss your project

Confirm the right panel and specification with GMiSU.

Send your drawings, dimensions, quantity, color, destination and target schedule for project-based recommendations.

Request a project quotation