From Panel Order Confirmation to Dispatch

Lock the specification and cutting schedule before production, then verify the shipment against the agreed list.

Discuss your project
GMiSU Technical Team
In this guide
GMiSU panel assembly and inspection area
Panel assembly and pre-shipment checks

Confirm the order

Production and inspection

Pack and ship

Confirm protective film, edge protection, pack supports and any crate requirements. Packaging and timber treatment must suit the destination. Reconcile the packing list and shipping documents with the final order before the shipment leaves.

GMiSU delivery workflow

  1. 01

    Technical approval

    Confirm the cutting schedule, quantities and accessory drawings before production.

  2. 02

    Proforma invoice and deposit

    Approve the commercial terms; a normal order uses a 30% T/T deposit.

  3. 03

    Production

    Schedule profile forming, polyurethane foaming and cutting to the approved lengths.

  4. 04

    Quality review

    Check dimensions, skin specifications, appearance and agreed inspection items.

  5. 05

    Video inspection and balance

    Arrange a WhatsApp or WeChat video review where agreed; the normal balance is 70%.

  6. 06

    Loading and documents

    Record packing and securing, then arrange the agreed export and shipping documents.

Keep the approval trail

Retain the approved drawings, proforma invoice, inspection records and packing list together. Payment and dispatch conditions remain those in the agreed contract. Photographs of loading help document shipment condition but do not replace the shipment's acceptance terms.

Export packing, bundle labels and receiving records

Insulated aluminum roof panel packing for export should connect each bundle number to product code, cut length, finish, piece count and roof zone. Agree package dimensions, surface and edge protection, handling restrictions, and photographs before closure and after loading. Total linear meters alone cannot determine a container loading plan.

Have the forwarder and receiving team confirm actual usable space, door clearance, unloading equipment and site access. Match bundle labels to the packing list. Record visible damage before unpacking and follow the agreed carrier, insurer and contract procedures; there is no universal claim deadline or unloading method for every shipment.